Site Preparation and Development of the Europacity Quarter, Berlin. Construction Time: 2013 – 2016

Restructuring of a former Barrier Drinker and revitalisation of a former railway system

Located directly next to the Berlin Central Station and vis-à-vis to the government district, the project area for the new urban quarter Europacity at Heidestrasse stretches north and covers an area of approximately 40 hectares. The objective of the development is a mixed quarter with unmistakable, high quality urban living: Living, work, culture and leisure time.

omniCon advised the owner of the area during the procurement of planning permission, public law contracts and technical contents of purchase contracts with prospective clients.

omniCon assumes all not delegable tasks of the client and control all processes.
As a prepared measure the restructuring of a former Deutsche Bahn Schwellentränke (tar oil and zink damage) through soil replacement has been made.

Projectdata

Our performanceControlling of planning, construction works for earth, dismantling, remediation, ordnance clearance and disposal operations.
Controlling of the restructuring of a Schwellentränke der Bahn.
Controlling of developement works for traffic area and outdoor installations.
ClientCA Immo Deutschland GmbH
LocationIn the north of Berliner central station
Gross floor areaca. 400.000 m²
Construction time2013 – 2016
Google Maps

Google Maps has been deactivated due to the cookie settings. To view the map, activate Google Maps in your cookie settings